Looking up the transparency page: construction, spending, attestations and schedule.
Platform under construction. Nothing on this site is a public offering or an investment recommendation.
Looking up the transparency page: construction, spending, attestations and schedule.
Progress data for the net-zero development trust in Puerto Madryn. The economic terms of each series are shown only behind invitation-based access.
$245,000 / $320,000
CO2 avoided: 0 kg
$0 / $0
Construction, impact and verifiability milestones, unlocked as the project progresses.
0 of 6 unlocked
These achievements track construction progress, energy, CO₂ avoided and on-chain evidence. They do not measure or promise any return: capital may be lost.
Money goes to an account in the trust's name, not a person's or the platform's. The trustee is registered with the CNV.
If a series' securities trade on an authorized market, the issuing entity is bound by that market's arbitration tribunal (art. 46 of Law 26.831), such as the Tribunal de Arbitraje General de la Bolsa de Comercio de Buenos Aires. You keep the option of going to court.
Material events are published on the CNV's Financial Information Highway, not only on our own screen.
Where it applies, the retail investor is covered by Law 24.240, on top of the capital-markets regime.
Tokenized brick, fixed-term deposit, treasury bills and money-market fund, side by side, with an open methodology and a cut-off date.
Figures as of July 1, 2026 (cut-off date). Each figure carries its source and its date: you can reproduce the number from the link in each row.
| Instrument | Annual rate | Real (inflation-adjusted) | Source |
|---|---|---|---|
Tokenized brick (public comparable) Base-scenario annual IRR estimated in the prospectus of the 'Espacio Añelo' real-estate financial trust (Vaca Muerta), with a public offering authorized by the CNV; issuer and trustee: CFA Compañía Fiduciaria Americana S.A. It is the issuer's estimate, not a realized return: the same prospectus includes a pessimistic scenario of 7.01%. It is a third-party comparable for the asset class, not the terms of this offering nor a projection of it. | 10.88% USD | in dollars | CNV (AIF) Apr 27, 2026 |
Fixed-term deposit (30 days) System-average nominal annual rate for a 30-day retail fixed-term deposit. | 19.00% ARS | -10.86% |
As of Oct 5, 2026
Financial progress is the amount certified against the value of the work contract, not against the capital being raised: capital includes land, fees and soft costs that never reach a certificate. While no contract value is loaded the percentage is not published, because a missing measure is honest and a measure against the wrong magnitude is not. Stockpiling and advances move money without moving work, so both measures are published separately. Retention is withheld until final acceptance.
No published work certificates.
The project is in operation: the units are finished and rented. This is what was collected each month, what it cost to run, and what was left.
These figures belong to the property, not to an investor. Between what the building earns and what an investor receives sit management fees, reserves and the developer's share, so dividing the net by the capital gives nobody's rate.
| Month | Collected | Operating costs | Net | Occupancy | Backing |
|---|---|---|---|---|---|
| 2026-06 | $3,600.00 | $1,430.00 | $2,170.00 | 6/6 | bae988…8fdaLiquidación de administración 2026-06 (demo)Incluye la prima anual del seguro del edificio |
| 2026-05 | $3,600.00 | $750.00 | $2,850.00 | 6/6 | eba1da…90c5Liquidación de administración 2026-05 (demo) |
| 2026-04 | $3,000.00 | $770.00 | $2,230.00 |
Permits, certificates, final-of-works, tax status and insurance for the property, each with hashed evidence. It is the first thing you should be able to check before believing the building exists and is in order.
The asset status has not been published yet.
Site coordinates
-42.7661, -65.0347
Open in a mapThe map is deliberately not embedded. A third-party map tells that third party who visits this page, and this product chose not to keep even its own IP addresses. The link opens outside the site.
No photos have been published for this project yet.
This is not a live camera: there is none on site, and simulating one would be showing something invented as if it were real. These are dated photos, with the hash of the published bytes, so anyone can check the image has not changed.
No budget has been loaded for this project yet.
No spend has been published for this project yet.
No published attestations.
Hashes are published on-chain on Base Sepolia during the back-office phase; until then they are recorded locally.
No public documents.
The same information on this page, for a machine: download it as JSON or CSV, with its methodology inside the file. No sign-up, no strings attached.
This project does not have a schedule loaded yet.
This is a risk instrument. Returns are a target, not a promise, and invested capital may be lost. Target amounts are shown in aggregate; ticket size, preferred rate, and conditions are shown only behind invitation, KYC, and jurisdiction access.
| Ámbito Jun 30, 2026 |
Treasury bills (short LECAP) Annualized return of a short capitalizing bill. It varies by maturity and by day. | 29.00% ARS | -3.37% | Ámbito May 31, 2026 |
Money-market fund (T+0) Nominal annual rate of an immediate-liquidity fund (virtual wallets), redeemable same day. | 17.00% ARS | -12.36% | Infobae Jul 8, 2026 |
The real return of the peso rows discounts year-over-year inflation of 33.5% using the formula (1 + nominal) / (1 + inflation) - 1. Dollar rows are not adjusted by Argentine CPI. Inflation source: INDEC
The rates shown are figures published or estimated by each source (the brick figure is an estimate from a third-party prospectus), variable, and not promises. Past or projected returns do not anticipate future ones and capital may be lost. This is not financial advice.
| 5/6 |
| 3bc62f…f714Liquidación de administración 2026-04 (demo) |
| 2026-03 | $3,600.00 | $910.00 | $2,690.00 | 6/6 | 90e404…5ca8Liquidación de administración 2026-03 (demo) |
| 2026-02 | $3,600.00 | $760.00 | $2,840.00 | 6/6 | b86006…6653Liquidación de administración 2026-02 (demo) |
| 2026-01 | $3,000.00 | $780.00 | $2,220.00 | 5/6 | 2c3286…5dc4Liquidación de administración 2026-01 (demo) |
| Total | $20,400.00 | $5,400.00 | $15,000.00 | 34 of 36 unit-months |
Sum from 2026-01 to 2026-06
What it has earned so far does not indicate what it will earn. Occupancy changes, costs change, and a month can close negative.
Collected, not invoiced. Rent accrued but unpaid cannot be distributed, and treating them alike would make the waterfall pay out something that never came in.
This screen records what happened, like a work certificate. In this version the platform moves no funds: whether a transfer happens is decided outside of here.
What is acquired is a contractual right against the vehicle that issues the series, not a right in rem over the property. Under the planned structure the property is held by the trust: a participant is not entered in the property registry, is not a co-owner, and cannot claim a physical portion of the asset. Tokenization is indirect, because the token represents the participation in the vehicle and not the property. The final structure of each series is not closed yet, and it may change the details but not this nature.
Draft wording, pending legal review.